top of page

 

Young City (Mlode Miasto) was the imperial shipyard of Gdansk, place full of history, saved from bombings of the Second World War. The project proposes to activate the potential of the neighborghood. 

Still respecting the identity of the site, the densification and new functions transform the place in a attractive and dynamic neighborhood. 

Having beeing working on the competition from the first sketches till the delivery, I have mainly worked on the conception of public spaces and realisation of numerous graphics.

​

 

Solvay Headquarters

Internship Henning Larsen - 2018

Competition 

​

This project tries to foster a new image and a new company culture by its architecture. The new headquarter contains 40000 m² of offices, laboratories, workshops and representational spaces, placed in connexion with existing structures. 

The project is based upon connecting all departments and users around a public space, the atrium. 

In this project I have been working on massing studies and then on plans and functional layouts of the project.

​

​

Olmsted

Internship Group 8 - 2016

Competition 2nd price

​

Competition of architecture and engineery of projects and ideas for the Health Campus, Chavannes-près-Rennens, Vaud

This project offers to bind the programs in a coherent unity, giving them common spaces. The association is made still respecting uses and allowing social gathering, and sharing of knowledges. The building claims an inherent urbanity, tied by an "interior street", passages, a "high line". 

Integrated in the competition team, I have participated at the drawing of the sections, elevations, sometimes, of plans, and also at the drawing of the diagrams.

​

​

EPFL daycare centre

Internship Group 8 - 2015

Building Completed - 2018

Competition 1st price

http://www.group8.ch/fr/projets/garderie-de-lepfl_35?category_id=1

​

I worked from the beginning of the competition project to the final output, in the team. My work was formal research in models and on sketchup or in elevation. I also worked on the survey and drawing of the existant façades, sometimes on plans, layout and on diagrams. 

​

​

Housing in Chêne-Bourg 

Internship Group 8 - 2015

http://www.group8.ch/fr/projets/untitled_24?category_id=1

​

Housing project, part of the Geneva's CEVA project.

On this project I worked in realising typology models. 

​

​

​

bottom of page